I think I spend about 220 hours in the design cutting and welding of the train.
My goal was to make it look authentic as possible. The fire box and cab area of the train are double walled with 2500 Degree insulation sandwiched between the walls. I had the train weighed it the I sent it to be powered coated and it toped the scale ate 3140 pounds. Not much chance of someone taking it from my back yard when I am not home.
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.