I just bought a second 4x4 Growth Series and I got the water table with the new table. On my old table I had the cutting slats on the same level as the front and rear rails so it was easy to slide my steel into position.
Now the steel has to drop down about 3 inches over the front rail with just a few inches of clearance around. How do you load your material. Dropping a 1/4" thick plate into position seems dangerous and now much more difficult. I was shocked when I saw this.
Now the steel has to drop down about 3 inches over the front rail with just a few inches of clearance around. How do you load your material. Dropping a 1/4" thick plate into position seems dangerous and now much more difficult. I was shocked when I saw this.